Independent Offshore & Onsite Services technicians are trained and certified for use of Lokring equipment in the installation of Lokring fittings, an alternative to hot-work repairs, effectively eliminating safety hazards associated with welding and grinding.
Our technicians can reliably install Lokring fittings in the field at a rate of roughly 10 times faster than equivalent weld connections, saving time and costs associated with manpower and materials. New fittings can be hydrotested by Independent Offshore & Onsite Services technicians to comply with ASME B31.3 standards on open connections, meaning no NDT required.