Independent Offshore Services technicians are trained and certified for use of Lokring equipment in the installation of Lokring fittings, an alternative to hot-work repairs, effectively eliminating safety hazards associated with welding and grinding.
Our technicians can reliably install Lokring fittings in the field at a rate of roughly 10 times faster than equivalent weld connections, saving time and costs associated with manpower and materials. New fittings can be hydrotested by Independent Offshore Services technicians to comply with ASME B31.3 standards on open connections, meaning no NDT required.